Melinco
Hotel Space Renewal

Solution

Hotel Space Renewal

Redefine the aesthetics and effectiveness of hotel walls — from lobby to guestroom

The Challenge of Hotel Renovation

Hotel walls are under constant pressure: high foot traffic, chemical cleaning agents, guest damage, and the need to maintain a premium appearance year-round. Traditional wall materials — latex paint, wallpaper, wall fabric, and solid wood panels — each carry serious long-term costs:

  • Latex paint — scratches visible within 3 years
  • Low-priced wallpaper — peeling within 3 months
  • Wall fabric — replacement needed every 3 years
  • Traditional solid wood panels — formaldehyde emissions above 0.05 mg/m³; annual crack repair costs exceeding 200 yuan/m²

The combined 5-year cost of these materials is often twice the upfront cost of high-end surface materials.

The Melinco Hotel Renewal System

Melinco’s wall renewal system solves these pain points with a single coordinated approach: pre-finished, zero-formaldehyde wall panels installed directly over existing surfaces — no demolition, no wet trades, no ventilation period.

Key Outcomes

MetricResult
Single room completion time0.5 days (4 hours per room)
Speed vs traditional methods5× faster
Ventilation periodZero
Occupancy rate increase36%+
Color consistencyDoors, walls, and cabinets — one matched color
Quality warranty20 years

Why Melinco for Hospitality

Zero downtime renovation — old walls are covered directly. Renovation proceeds room by room while the hotel remains in operation. No floor closures, no loss of revenue.

Guaranteed eco-safe — exceeds ENF-level environmental protection standards. Zero heavy metals. No pungent odors. Rooms are immediately occupancy-ready after installation.

Same-color system — doors, walls, and cabinets are matched in one color reference. Eliminates the color-code mismatch (typically 3+ codes) between surfaces sourced from different suppliers — a common driver of negative guest reviews.

Durable and timeless — reinforced base material combined with a high-grade decorative finish. Easy to clean — wipe with a damp cloth. Resistant to scratches, alkali efflorescence, and moisture.

Modular quick assembly — standard guestroom types completed in 4 hours. Large-scale projects benefit from Melinco’s 5-day minimum production lead time and bulk logistics planning.

Investment Return

Hotels that have completed Melinco renewals report:

  • Higher room pricing following the upgrade
  • Reduction in negative reviews related to wall condition
  • Improved occupancy rates within 3 months of reopening
  • Significant reduction in annual wall maintenance expenditure

From Lobby to Guestroom

Melinco’s Hotel Renewal System covers the full interior envelope:

  • Guestrooms — wall panels, door surfaces, wardrobe fronts in matched finish
  • Corridors — full-height or dado-height panels with integrated skirting
  • Lobbies and reception — large-format decorative panels and feature walls
  • Restaurants and function rooms — custom finishes to brand specification

Contact our project team with your floor plans and current FF&E schedule to receive a surface package proposal, material quantities, and lead time within 48 hours.

Gallery

Start a Project

Ready to transform your space?

Share your floor plans or project brief. We'll prepare a surface package proposal within 48 hours.

Contact Our Team
All Solutions